There are three standard conditions that cause waters seepage and water leakage while in the curtain wall: there are usually pores; there is h2o; there is a difficulty difference of seepage chips. Eliminating one or more these basic conditions is easy methods to prevent water leakage: Very first, minimize pores The second is to block the rain so that it doesn't wet the gap regularly; the third is to cut back the wind pressure difference in the wetted gap.
1In the particular curtain wall aluminum account, a small hole flowing for the outside is opened, plus the water entering the curtain wall through the small gap is amassed and discharged outside this curtain wall, and several water in the isostatic chamber in between the glass, the aluminum profile along with the aluminum buckle is dispatched.
2 When designing, it is usually conceivable to set " up " collecting pipes and drainage pipes within the glass curtain wall, collect water that has penetrated into your cracks into the drape wall, and smoothly discharge them to somewhat of a designated drainage hole with the drainage pipe.
3 Work with high-quality structural silicone sealant, weather-resistant silicone sealant, wall structure edge glue, and strengthen inspection to forestall expiration. Use high-quality float glass, colored Laminated glass must often be edge treated, glass size error meets typical requirements.
4 Pay attention to controlling the utilization environment of the sealant. It is strictly forbidden to carry out the construction of weather-resistant silicone sealant from the open air. The indoor temperature ought not be higher than 27 °C, and the relative humidity shouldn't be lower than 50%. Before the injection, the aluminum mode, glass or gap might be Dust, oil stains, loose objects and various dirt are removed. Once injection, the material really should be embedded and compacted, the surface needs to be flat, and the maintenance should be strengthened to prevent hand mold and water flushing.
5 In accordance with the requirements of the particular specification, the waterproof curtain leakage performance inspection must be carried out in the process of construction of the particular glass curtain wall in order to repair and control the grade of the curtain wall.
6 The quality inspection of glass curtain wall is divided straight into two types: concealed acclaim and engineering acceptance. Concealed acceptance is done after the installation involving aluminum profile frame. It mainly checks the firmness of the connection steel code, and checks the installation on the gap node with the key structure of the curtain wall, installation of enlargement joints, etc. 2. The engineering acceptance is carried out after the completion in the glass curtain wall job.