The sand production line is mainly composed of jaw crusher, cone crusher, sand making machine, vibration screen, sand washing machine and belt conveyor. According to different technological requirements, the equipment of suitable type is used to configure and give full play to its best performance. Site requirements of sand production line:
Suitable transportation conditions should be established: highway transportation should be easy to connect with national highway lines, waterway transportation should be easy to share existing wharfs or select suitable locations for new wharfs. In general, the site of sand production line should be close to the quarry and the site of material application.
There should be better engineering geological conditions: the site should be avoided under the fault, landslide and flood level, and bad sections or cultural relics such as dissolution, silt, humus and ancient wells should be avoided. Soil bearing capacity generally requires not less than 200 kN/mz, so it is not suitable to build factories in the areas of frequent earthquakes or collapsible loess layers with magnitude 2 or above.
The principle of land conservation should be implemented: whether built on hillsides or on flat land, the premise of production needs is to occupy as little land as possible, especially less or not.
Water Supply Conditions: On the premise of ensuring water quality and quantity to meet production and living needs, the site should be as close as possible to the water source, and attention should not be paid to competing with agriculture for water. We should save transportation costs as much as possible, strive to achieve self-flow or semi-self-flow transportation when conditions permit, and be careful to prevent the harm or pollution caused by waste to the environment, rivers, agriculture, animal husbandry, fishery production and residential areas.
Power Supply Conditions: Breaking through the difficult problem of rough processing of sand production line in stone materials, it is better to have reliable power supply, and shorten the transmission line as far as possible. Whoever has the conditions to use power grid for power supply, should be used as far as possible, so as not to increase investment and operation and management costs for self-built power plants.